This drip bowl is used for electric cooktops and ranges, it is designed to sit under a 6-inch surface burner. It catches the drips and spills coming from the cookware on the surface burner. This drip ...
This newer-style terminal block kit includes two metal brackets, two pre-crimped wires with terminals, two ceramic wire nuts, a heat shrinking tube, and a mounting screw.
This 6 inch surface burner with reinforced delta frame carries 1250 watts and 240 volts. It has four turns and is compatible with many electric ranges. Its center medallion is all black in color.
This electric range delta frame surface element with looped terminal ends measures eight inches and has five turns. It carries 2600 watts the center medallion is black in color.
This Harper Wyman style 6707 series oven thermostat has a temperature range between 150 degrees Fahrenheit and 550 degrees Fahrenheit, as well as a fixed broiling temperature. There is an "off" positi...
First I removed the screw that held it in place with a socket. The agitator became loose and easy to remove at this time so I lifted it from the washing machine. I then just placed the new agitator in place and replaced the screw being careful not to do it too tight. The replacing of this part was an easy job and thanks to Part Select it saves me hundreds of dollars.
I unplugged the stove from the outlet, then removed the two burners I was going to be working on and the drip pans. Then I raised the top part of the stove and removed the screws holding the plug-in blocks to the stove. Then I cut the two wires going to the old plug-in block and stripped the wires back to match the new wire parts. Then I placed the sleeves over the new wires, then I placed the new wire beside the wire I stripped on the stove and screw on the wire cap making sure it was tight. I repeated this three more times, once I had all four wires connected I then placed the sleeves over the connections and heated them up until they were formed around the connection. Once I had all the connections done I placed one wire at a time into the plug-in block until it locked into place ( I looked at my old plug-in blocks first to make sure I placed the new wires in the correct way ).I then used the metal mounting bracket that matched my old ones and snapped the correct one onto each plug-in block. Before mounting them onto the stove I compared them to my old ones to make sure they were correct. Then I used the new screws to mount them to the stove. I took a second look at everything I had done before closing the top cover of my stove. After lowering the cover back into place I put both the drip covers in place and then installed the burners.I then plugged the stove back into the outlet and tried the burners. This was very simple and the video on the web site shows this very well which made my job very simple.
unplugged unit,removed liquid cup,removed nut holding agitator,removed agitator installed new one installed nut tightened and tested operation very easy job!